{"id":33078,"date":"2025-06-26T07:50:43","date_gmt":"2025-06-26T07:50:43","guid":{"rendered":"https:\/\/airtificial.com\/?p=33078"},"modified":"2025-06-27T08:23:06","modified_gmt":"2025-06-27T08:23:06","slug":"airtificial-to-build-a-major-dam-in-the-dominican-republic","status":"publish","type":"post","link":"https:\/\/airtificial.com\/en\/blog\/2025\/06\/airtificial-to-build-a-major-dam-in-the-dominican-republic\/","title":{"rendered":"Airtificial to build a major dam in the Dominican Republic"},"content":{"rendered":"<p><span style=\"text-decoration: underline\">Develops the engineering, management, and supervision of a strategic project<\/span><\/p>\n<ul>\n<li><strong>Airtificial Infrastructures has been awarded, in a 50\/50 joint venture with a renowned local partner, a \u20ac6 million contract in the Dominican Republic to provide engineering, management, and construction supervision services for the \u2018Boca de los R\u00edos Dam\u2019 project on the Guayub\u00edn River<\/strong><\/li>\n<li><strong>This project, considered strategic for the country, is led by the state-owned Empresa de Generaci\u00f3n Hidroel\u00e9ctrica Dominicana (EGEHID), with completion scheduled for December 2026<\/strong><\/li>\n<\/ul>\n<p><strong data-start=\"713\" data-end=\"739\">Madrid, June 25, 2025.<\/strong> Airtificial has secured a new contract that further strengthens its reputation and positioning as a leading engineering company in water infrastructure projects and water resource management in Latin America. The Group&#8217;s Infrastructures division will sign, on a 50\/50 basis with a prestigious local partner, a \u20ac6 million agreement in the Dominican Republic for the management, engineering, and supervision of the Boca de los R\u00edos Dam project on the Guayub\u00edn River in Santiago Rodr\u00edguez province. The project will last 18 months, with completion expected by the end of 2026.<\/p>\n<p>The initiative, promoted by the Empresa de Generaci\u00f3n Hidroel\u00e9ctrica Dominicana (EGEHID), involves the construction of a concrete dam nearly 41 meters high, a 640-meter-long lateral rockfill closure dyke with a variable-height impermeable core (ranging from 1.5 to 11 meters) on the left bank, and a reservoir with a capacity of over 50 million cubic meters. Its primary goals include agricultural irrigation, potable water supply, livestock industry development, and future hydroelectric power generation.<\/p>\n<h3 data-start=\"1827\" data-end=\"1850\">Social Commitment<\/h3>\n<p>The project aims to sustainably regulate river flows to ensure a more reliable water supply for surrounding irrigation areas while also modernizing them. In addition to technical supervision of the dam, the project includes the reconstruction of more than 19 kilometers of rural roads and the rehabilitation of 25 kilometers of highway between the municipalities of Los Quemados and Sabaneta. This contract further consolidates Airtificial\u2019s position in the sustainable infrastructure sector in Latin America, where the company has over 50 years of experience, providing high-value technical consultancy, quality control, design review, and management of complex projects.<\/p>\n<p>\u201cOur participation in the Boca de los R\u00edos Dam project represents not only a technical milestone but also a firm commitment to sustainable development and improving the living conditions of thousands of people. All this in collaboration with a leading engineering firm in the Dominican Republic with the highest reputation in the national market,\u201d says Guillermo Fern\u00e1ndez de Pe\u00f1aranda, CEO of Airtificial.<\/p>\n<h3 data-start=\"2938\" data-end=\"2961\">About Airtificial<\/h3>\n<p>Airtificial offers global and innovative design and manufacturing solutions for the automotive, civil and defense aerospace, infrastructure, and other industrial sectors. The company integrates advanced technologies such as robotics and artificial intelligence, combined with human expertise, to contribute to more sustainable development. Listed on the Continuous Market, Airtificial operates in 18 countries across key markets in Europe, the Americas, and Asia, supporting the digital transformation, automation, and process optimization of its industrial clients through sustainable and competitive growth.<\/p>\n<p><strong data-start=\"3581\" data-end=\"3599\">Press Contact:<\/strong><br data-start=\"3599\" data-end=\"3602\" \/>Fernando Garc\u00eda and Guiomar P\u00e9rez<br data-start=\"3635\" data-end=\"3638\" \/>Phone: +34 91 576 52 50 \/ +34 696 249 078<br data-start=\"3679\" data-end=\"3682\" \/>Email: <a class=\"cursor-pointer\" rel=\"noopener\" data-start=\"3689\" data-end=\"3726\">airtificial@estudiodecomunicacion.com<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Develops the engineering, management, and supervision of a strategic project Airtificial Infrastructures has been awarded, in a 50\/50 joint venture with a renowned local partner, a \u20ac6 million contract in the Dominican Republic to provide engineering, management, and construction supervision services for the \u2018Boca de los R\u00edos Dam\u2019 project on the Guayub\u00edn River This project, [&hellip;]<\/p>\n","protected":false},"author":12,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_bbp_topic_count":0,"_bbp_reply_count":0,"_bbp_total_topic_count":0,"_bbp_total_reply_count":0,"_bbp_voice_count":0,"_bbp_anonymous_reply_count":0,"_bbp_topic_count_hidden":0,"_bbp_reply_count_hidden":0,"_bbp_forum_subforum_count":0,"inline_featured_image":false,"footnotes":""},"categories":[6,26],"tags":[],"class_list":["post-33078","post","type-post","status-publish","format-standard","hentry","category-airtificial-group-en","category-infrastructures-en-2"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.6 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Airtificial to build a major dam in the Dominican Republic - Airtificial<\/title>\n<meta name=\"description\" content=\"Airtificial is developing a new water engineering project in the Dominican Republic: the Boca de los R\u00edos Dam for irrigation and potable water systems.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/airtificial.com\/en\/blog\/2025\/06\/airtificial-to-build-a-major-dam-in-the-dominican-republic\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Airtificial to build a major dam in the Dominican Republic - Airtificial\" \/>\n<meta property=\"og:description\" content=\"Airtificial is developing a new water engineering project in the Dominican Republic: the Boca de los R\u00edos Dam for irrigation and potable water systems.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/airtificial.com\/en\/blog\/2025\/06\/airtificial-to-build-a-major-dam-in-the-dominican-republic\/\" \/>\n<meta property=\"og:site_name\" content=\"Airtificial\" \/>\n<meta property=\"article:published_time\" content=\"2025-06-26T07:50:43+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-06-27T08:23:06+00:00\" \/>\n<meta name=\"author\" content=\"ipalacio\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"ipalacio\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Airtificial to build a major dam in the Dominican Republic - Airtificial","description":"Airtificial is developing a new water engineering project in the Dominican Republic: the Boca de los R\u00edos Dam for irrigation and potable water systems.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/airtificial.com\/en\/blog\/2025\/06\/airtificial-to-build-a-major-dam-in-the-dominican-republic\/","og_locale":"en_US","og_type":"article","og_title":"Airtificial to build a major dam in the Dominican Republic - Airtificial","og_description":"Airtificial is developing a new water engineering project in the Dominican Republic: the Boca de los R\u00edos Dam for irrigation and potable water systems.","og_url":"https:\/\/airtificial.com\/en\/blog\/2025\/06\/airtificial-to-build-a-major-dam-in-the-dominican-republic\/","og_site_name":"Airtificial","article_published_time":"2025-06-26T07:50:43+00:00","article_modified_time":"2025-06-27T08:23:06+00:00","author":"ipalacio","twitter_card":"summary_large_image","twitter_misc":{"Written by":"ipalacio","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/airtificial.com\/en\/blog\/2025\/06\/airtificial-to-build-a-major-dam-in-the-dominican-republic\/#article","isPartOf":{"@id":"https:\/\/airtificial.com\/en\/blog\/2025\/06\/airtificial-to-build-a-major-dam-in-the-dominican-republic\/"},"author":{"name":"ipalacio","@id":"https:\/\/airtificial.com\/#\/schema\/person\/d27329a163bf830028da0a18fc0788cc"},"headline":"Airtificial to build a major dam in the Dominican Republic","datePublished":"2025-06-26T07:50:43+00:00","dateModified":"2025-06-27T08:23:06+00:00","mainEntityOfPage":{"@id":"https:\/\/airtificial.com\/en\/blog\/2025\/06\/airtificial-to-build-a-major-dam-in-the-dominican-republic\/"},"wordCount":501,"articleSection":["Airtificial Group","Infrastructures"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/airtificial.com\/en\/blog\/2025\/06\/airtificial-to-build-a-major-dam-in-the-dominican-republic\/","url":"https:\/\/airtificial.com\/en\/blog\/2025\/06\/airtificial-to-build-a-major-dam-in-the-dominican-republic\/","name":"Airtificial to build a major dam in the Dominican Republic - Airtificial","isPartOf":{"@id":"https:\/\/airtificial.com\/#website"},"datePublished":"2025-06-26T07:50:43+00:00","dateModified":"2025-06-27T08:23:06+00:00","author":{"@id":"https:\/\/airtificial.com\/#\/schema\/person\/d27329a163bf830028da0a18fc0788cc"},"description":"Airtificial is developing a new water engineering project in the Dominican Republic: the Boca de los R\u00edos Dam for irrigation and potable water systems.","breadcrumb":{"@id":"https:\/\/airtificial.com\/en\/blog\/2025\/06\/airtificial-to-build-a-major-dam-in-the-dominican-republic\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/airtificial.com\/en\/blog\/2025\/06\/airtificial-to-build-a-major-dam-in-the-dominican-republic\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/airtificial.com\/en\/blog\/2025\/06\/airtificial-to-build-a-major-dam-in-the-dominican-republic\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/airtificial.com\/en\/"},{"@type":"ListItem","position":2,"name":"Airtificial to build a major dam in the Dominican Republic"}]},{"@type":"WebSite","@id":"https:\/\/airtificial.com\/#website","url":"https:\/\/airtificial.com\/","name":"Airtificial","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/airtificial.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/airtificial.com\/#\/schema\/person\/d27329a163bf830028da0a18fc0788cc","name":"ipalacio","url":"https:\/\/airtificial.com\/en\/blog\/author\/cdelclaux\/"}]}},"_links":{"self":[{"href":"https:\/\/airtificial.com\/en\/wp-json\/wp\/v2\/posts\/33078","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/airtificial.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/airtificial.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/airtificial.com\/en\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/airtificial.com\/en\/wp-json\/wp\/v2\/comments?post=33078"}],"version-history":[{"count":0,"href":"https:\/\/airtificial.com\/en\/wp-json\/wp\/v2\/posts\/33078\/revisions"}],"wp:attachment":[{"href":"https:\/\/airtificial.com\/en\/wp-json\/wp\/v2\/media?parent=33078"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/airtificial.com\/en\/wp-json\/wp\/v2\/categories?post=33078"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/airtificial.com\/en\/wp-json\/wp\/v2\/tags?post=33078"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}