Airtificial to build a major dam in the Dominican Republic
Develops the engineering, management, and supervision of a strategic project
- Airtificial Infrastructures has been awarded, in a 50/50 joint venture with a renowned local partner, a €6 million contract in the Dominican Republic to provide engineering, management, and construction supervision services for the ‘Boca de los Ríos Dam’ project on the Guayubín River
- This project, considered strategic for the country, is led by the state-owned Empresa de Generación Hidroeléctrica Dominicana (EGEHID), with completion scheduled for December 2026
Madrid, June 25, 2025. Airtificial has secured a new contract that further strengthens its reputation and positioning as a leading engineering company in water infrastructure projects and water resource management in Latin America. The Group’s Infrastructures division will sign, on a 50/50 basis with a prestigious local partner, a €6 million agreement in the Dominican Republic for the management, engineering, and supervision of the Boca de los Ríos Dam project on the Guayubín River in Santiago Rodríguez province. The project will last 18 months, with completion expected by the end of 2026.
The initiative, promoted by the Empresa de Generación Hidroeléctrica Dominicana (EGEHID), involves the construction of a concrete dam nearly 41 meters high, a 640-meter-long lateral rockfill closure dyke with a variable-height impermeable core (ranging from 1.5 to 11 meters) on the left bank, and a reservoir with a capacity of over 50 million cubic meters. Its primary goals include agricultural irrigation, potable water supply, livestock industry development, and future hydroelectric power generation.
Social Commitment
The project aims to sustainably regulate river flows to ensure a more reliable water supply for surrounding irrigation areas while also modernizing them. In addition to technical supervision of the dam, the project includes the reconstruction of more than 19 kilometers of rural roads and the rehabilitation of 25 kilometers of highway between the municipalities of Los Quemados and Sabaneta. This contract further consolidates Airtificial’s position in the sustainable infrastructure sector in Latin America, where the company has over 50 years of experience, providing high-value technical consultancy, quality control, design review, and management of complex projects.
“Our participation in the Boca de los Ríos Dam project represents not only a technical milestone but also a firm commitment to sustainable development and improving the living conditions of thousands of people. All this in collaboration with a leading engineering firm in the Dominican Republic with the highest reputation in the national market,” says Guillermo Fernández de Peñaranda, CEO of Airtificial.
About Airtificial
Airtificial offers global and innovative design and manufacturing solutions for the automotive, civil and defense aerospace, infrastructure, and other industrial sectors. The company integrates advanced technologies such as robotics and artificial intelligence, combined with human expertise, to contribute to more sustainable development. Listed on the Continuous Market, Airtificial operates in 18 countries across key markets in Europe, the Americas, and Asia, supporting the digital transformation, automation, and process optimization of its industrial clients through sustainable and competitive growth.
Press Contact:
Fernando García and Guiomar Pérez
Phone: +34 91 576 52 50 / +34 696 249 078
Email: