SERVICES FOR TECHNICAL, ADMINISTRATIVE AND FINANCIAL VERIFICATION OF THE MONTEGRANDE DAM CONSTRUCTION - MULTIPLE PROJECT- PHASE III
DOMINICAN REPUBLIC
The project is consigned by National Institute of Hydraulic Resources (INDRHI) and is structured in three phases. The first two phases have already been executed. This third phase, financed by CABEI, consists of the construction of the Montegrande dam, with 380 million cubic metres of water, whose main objectives are to control floods, provide water for home use and agricultural irrigation as well as the generation of energy at a later stage, or the development of aquaculture and tourism activities.
AIRTIFICIAL INFRASTRUCTURES, as the Verification Firm, advises and reports to CABEI on the execution of the project and contributes to the verification of compliance with the contractual commitments made by the borrower with the Bank to facilitate the process of disbursements under the loan. It also provides a comprehensive analysis of the problems encountered in the project and proposes alternative solutions to safeguard CABEI’s interests.
Dam typology: Loose materials
Dam height: 55 m
Reservoir volume: 380 Hm3
Translated with www.DeepL.com/Translator (free version)