DRAFTING THE PRELIMINARY DESIGN FOR THE GIPUZKOA ENVIRONMENTAL CENTER TENDER, STAGE 2
SPAIN
Drafting the preliminary design using BIM methodology along with assisting to prepare stage 2 documents for the Gipuzkoa Environmental Center tender. Drawing up the design for independent waste treatment, which includes the incinerator slag treatment plant with a treatment capacity of 52,000 t/year, along with the dry-fermentation plant for separately collected organic fraction with a capacity of 40,000 t/year, scalable to 60,000 t/year.